,

NorFlex: making local flexibility available to Transmission System Operator (TSO) – mFRR market

The NorFlex project objective is to develop tomorrow’s power grid by enabling flexible power consumption.  Over 3 years Agder Energi, Glitre Energi, Statnett, and NODES will test different technological solutions to enable local flexibility to be available to the grid both locally and centrally.  The project will demonstrate how flexibility offered at a local level can be made available to the existing TSO reserve market.

6. January 2022: NorFlex project demonstrates integration to Statnett’s mFRR market.