sthlmflex - Expression of Interest

sthlmflex is a research project where Svenska kraftnät (Svk), Vattenfall Eldistribution, Ellevio and E.ON Energy Distribution are trialling a flexibility market in Greater Stockholm. NODES acts as independent market operator. The regional network operators, Vattenfall Eldistribution and Ellevio, and the local network operator, E.ON Energy Distribution purchase flexibility in NODES’ hourly near term market (ShortFlex) and through tenders for seasonal contracts (LongFlex). After the ShortFlex market closes each day, flexibility that remains can participate in Svk’s manual frequency restoriation reserve (mFRR) market.

Flexibility service providers (FSPs) that are interested in participating as sellers in sthlmflex should:

i) Submit the Expression of Interest form below.
ii) Upload asset details using the Excel template.

The following deadlines apply for participation in sthlmflex during the Winter season 2022-23:

Deadline to submit the the Expression of Interest form: 2022-08-31
Deadline to upload asset details for participation in the LongFlex tender: 2022-08-31
Deadline to upload asset details for participation in the ShortFlex market: 2022-09-18

Assets that are located in E.ON Energy Distribution’s local network areas may submit the form and asset details later.

Participating assets need to be located in the grid areas shown in the map below. Two of E.ON’s local grid areas are located below the Stockholm North and South regional grid areas. These areas therefore overlap. Assets that are located in E.ON’s local network areas that are linked to the regional network can sell flexibility both at a local and regional level.

When filling out the Expression of Interest form, FSPs are only expected to provide an approximate distribution of flexibility assets between the grid areas. FSPs with assets located in E.ON’s local grid areas should include these in E.ON’s local grid areas only.

For questions please contact  member.services@nodesmarket.com

Form Image
  • Company and Contact Details

  • Data Management

  • FSPs can elect to calculate their own baseline values, rather than relying on the default baseline. Do you intend to calculate your own baseline?
  • FSPs can elect to provide their own meter values, rather than relying on meter data provided by the network operators. Do you intend to provide your own meter data?
  • Products

  • Market participation

  • Number of flexibility assets (approximation)

    FSPs are only expected to provide an approximate distribution of flexibility assets between the grid areas. Two of E.ON's local grid areas are located below the regional grid areas. FSPs with assets located in E.ON's local grid areas should include these in E.ON's local grid areas only. Assets that are located in E.ON's local network area can sell flexibility both at a local and regional level.
  • Linked to regional grid area
  • Linked to regional grid area
  • NOT linked to regional grid area in sthlmflex
  • Estimated flexibility volume (approximation)

    FSPs are only expected to provide an approximate distribution of flexibility assets between the grid areas. Two of E.ON's local grid areas are located below the regional grid areas. FSPs with assets located in E.ON's local grid areas should include these in E.ON's local grid areas only. Assets that are located in E.ON's local network area can sell flexibility both at a local and regional level.
  • Linked to regional grid area
  • Linked to regional grid area
  • NOT linked to regional grid area in sthlmflex
  • Consent to Information Handling

  • This field is for validation purposes and should be left unchanged.

Form Image

Asset details

Please upload information about your assets using the Excel template (see below). For participation in the seasonal LongFlex tender, please respond to the Invitation to Tender (ITT) issued by Vattenfall Eldistribution by submitting the Tender Form at the latest on 20 October 2023.
Max. file size: 10 MB.