Expression of interest in participating in the ShortFlex market for sthlmflex

Thank you for your interest in sthlmflex; a regional flexibility marketplace trialled as part of a research and development project run by Svenska Kraftnät, Vattenfall Eldistribution and Ellevio.  The project uses NODES marketplace.

Please register interest in participating as a flexibility service provider (FSP) in the near term flexibility market (ShortFlex) by filling in the “ShortFlex – Expression of interest” form.  Register additional assets by using the “ShortFlex – Expression of interest – additional assets” form below.

The registration is non-binding, but as part of the questions we ask that you confirm your intention to participate.

Registered parties will also be notified when registration for participation in the tendering process for long term availability contracts (LongFlex) opens.

The deadline for ShortFlex registration is 2020-09-09.

More information about the project can be found on the project’s home page: https://www.svk.se/sthlmflex (in Swedish)

For questions about the project, please contact:

Svenska Kraftnät
Project information and mFRR participation: magnus.linden@svk.se, linda.schumacher@svk.se

Vattenfall Eldistribution:
Project information: yvonne.ruwaida@vattenfall.com
Participation as a Flexibility Service Provider (FSP) in Stockholm Södra  and Norra: bjorn.godring@vattenfall.com

Ellevio:
Project information: bengt.i.johansson@ellevio.se
Participation as a Flexibility Service Provider (FSP) in Stockholm City: stefan.lindbom@ellevio.se

NODES  
Information related to the registration process and NODES market: sofia.eng@nodesmarket.com

 

Please submit this form to registre basic site and technical information

Form Image
  • Site information and technical information

  • If you are providing aggregated volumes, please enter "Aggregator. See excel file"
  • File should contain "asset name", "local network area" and "meter point ID" and "asset type" for each asset (file size< 2MB)
    Max. file size: 2 MB.
  • For aggregators, please select "aggregator" and include local area in the excel file you upload. For reference please check: www.natomraden.se
  • For evaluation purposes (in April 2021), can you confirm that you are willing to provide details on whether the flexibility you have provided is demand response or an alternative energy resource and if so what type?
  • Asset Information

  • What maximum amount (average 1 hour) of power could be available as a 1 hour bid form asset for distribution network flexibility? (hours of bid is up to the FSP)
  • What minimum amount (average 1 h) of power could be available as a 1 hour bid from the asset for distribution network flexibility? (Hours of bids is up the FSP)
  • Please specify service
  • For generators only

  • What climate impact does the activation have per MWh (schablon)?
  • Consent

  • Please verify your consent below.
  • Additional assets

    Do you need to register additional assets? Please submit this form and then add additional asset information in the "ShortFlex - Expression of interest - additional assets" form
  • This field is for validation purposes and should be left unchanged.

Make sure that you have submitted the main Expression of interest form before registering additional assets that you manage. Please complete one registration per asset.

Form Image
  • Site information and technical information

  • If you are providing aggregated volumes, please enter "Aggregator. See excel file"
  • Excel file should contain "asset name", "local network area" and "meter point ID" and "asset type" for each asset (file size< 2MB)
    Max. file size: 2 MB.
  • For aggregators, please select "aggregator" and include local area in the excel file you upload. For reference please check: www.natomraden.se
  • Asset Information

  • What maximum amount (average 1 hour) of power could be available as a 1 hour bid form asset for distribution network flexibility? (hours of bid is up to the FSP)
  • What minimum amount (average 1 h) of power could be available as a 1 hour bid from the asset for distribution network flexibility? (Hours of bids is up the FSP)
  • Please specify service
  • For generators only

  • What climate impact does the activation have per MWh (schablon)?
  • This field is for validation purposes and should be left unchanged.