ShortFlex - Average price history

 

UK – IntraFlex phase 2 – Western Power Distribution

Week Volume weighted average price (GBP/MW*h) Min (GBP/MW*h) Max (GBP/MW*h) Net traded volume (MW*h)
18 299.02 1.00 300.00 22.48
19 300.00 300.00 300.00 24.143
20 299.46 1.00 300.00 23.465
21 296.79 75.00 300.00 12.31
22 300.00 300.00 300.00 29.285
23 296.32 225.00 300.00 31.456
24 298.95 175.00 300.00 35.071
25 284.68 1.00 300.00 30.603
26 290.28 270.00 300.00 23.762
27 308.80 60.00 360.00 19.201
28 309.14 120.00 360.00 9.937
29 320.74 180.00 360.00 14.854
30 286.59 180.00 300.00 37.265
31 266.60 120.00 300.00 18.333
32 277.92 240.00 300.00 31.863
33 280.62 210.00 300.00 28.074
34 283.10 210.00 300.00 12.415
35 296.84 240.00 300.00 25.77


Norway – NorFlex – Agder Energi Nett

Week Volume weighted average price (NOK/MW*h) Min (NOK/MW*h) Max (NOK/MW*h) Net traded volume (MW*h)
3 3746.42 2500.00 5000.00 1.396
4 3702.14 2500.00 5000.00 1.541
5 3340.82 2500.00 5000.00 2.984
6 4042.95 2500.00 7800.00 6.477
7 4218.58 2500.00 5600.00 4.225
8 4193.62 2500.00 6000.00 4.222
9 4415.7 2500.00 7000.00 1.637
10 4718.2 100.00 5200.00 1.062
11 4638.94 4500.00 6200.00 2.332
12 4571.49 2500.00 7500.00 3.329

Pause in trading between week 13 and 16.

Week Volume weighted average price (NOK/MW*h) Min (NOK/MW*h) Max (NOK/MW*h) Net traded volume (MW*h)
17 4251.97 2500.00 7200.00 3.975
18 4318.34 2500.00 10100.00 3.985
19 4522.44 2500.00 5000.00 5.894
20 4663.97 4500.00 5500.00 3.717
21 4694.85 4500.00 5000.00 1.981
22 8432.06 4500.00 9500.00 2.046
23 * 24724.77 5000.00 30000.00 8.195

* “Simulation week” – DSO simulating stress event in their grid.

Pause in trading between week 24 and 33.

Week Volume weighted average price (NOK/MW*h) Min (NOK/MW*h) Max (NOK/MW*h) Net traded volume (MW*h)
34 3957.00 1000.00 9800.00 16.232
35 8652.36 1000.00 10000.00 11.644
36 8571.12 1000.00 10000.00 10.125


Norway – Smart Senja – Arva

Smart Senja is a research project where NODES operate a flexibility market on the island Senja in northern Norway. The project investigates how flexibility can be used to solve grid problems in a sparsely populated area. The first phase of flexibility trading was done during May – June 2021. The market will open for trading again in the period October 2021 – April 2022.

More Information about the project can be found here: https://smartsenja.no/en/

Period Volume weighted average price (NOK/MW*h)
Net traded volume (MW*h)
May 2021 – June 2021 5000.00 0.759


SWEDEN – sthlmflex – Vattenfall Eldistribution – Ellevio – SVK

Price of flexibility from flexibility service providers (SEK/MW*hour)
Week Volume weighted average price Min Max
2
3
4 849.97 200.00 842.00
5 876.90 200.00 5000.00
6 457.14 200.00 2000.00
7
8
9
10 300 300 300
11
Price of temporary transmission connection capacity subscription*  (SEK/MW*hour)
Week Volume weighted average price Min Max
2 244.09 242.00 246.00
3 242.00 242.00 242.00
4 243.78 242.00 246.00
5 244.07 242.00 246.00
6 244.19 242.00 246.00
7
8
9
10
11

* As part of sthlmflex, the distribution network operators Vattenfall Eldistribution and Ellevio can request and utilise a temporary increase in their transmission network connection capacity subscription from the transmission system operator Svenska kraftnät. The price of utilising this temporary subscription increase and the volume available competes with flexibility offered by flexibilit service providers in the market.

Norway – CINELDI Bremanger – Linja

As part of the Norwegian CINELDI FME project Linja AS (former SFE NETT AS) was piloting a NODES ShortFlex market for Bremanger.

Period Volume weighted average price (NOK/MW*h)
Net traded volume (MW*h)
October 2020 – February 2021 13 599.99 0.861

UK – IntraFlex phase 1- Western Power Distribution

In the first phase, August-September 2020, WPD procured 50.15MW of flexibility services across 241 trades with large variety across them.

Some bids were matched within 10 minutes of being uploaded; others were matched less than two hours ahead of real time.

Average price UK:

Week 40 (21.-30.9.20):      166.98 GBP/MW/HH
Week 39 (17.-23.9.20):      
150.23 GBP/MW/HH
Week 38 (10.-16.9.20):       
162.00 GBP/MW/HH
Week 37 (3.-9.9.20):
           158.00 GBP/MW/HH
Week 36 (27.8-2.9.20):       150.00 GBP/MW/HH